We successfully delivered a complete 13.76 MWh energy storage system, designed for maximum performance even in the most demanding operational environments.

The project consists of four fully integrated BESS containers, each with a capacity of 3.44 MWh, operating together as a single, perfectly synchronized solution. Each component has been chosen and configured to ensure reliability, efficiency and total control.

The system is supported by two high-performance boost inverter skids, each integrating:

  • dual 1,725 ​​kW PCS units,
  • voltage boosting transformer from 0.8 kV to 20 kV,
  • medium voltage interconnection equipment at 20 kV.

At the heart of the entire solution is an advanced Energy Management System, which intelligently coordinates all critical functions, optimizing daily operation and ensuring peak performance in the long term.

The system was designed for true Plug & Play, which means:

  • rapid implementation,
  • seamless integration,
  • simple and efficient operation.

On-time delivery, uncompromising standards, and precise execution — because when excellence is non-negotiable, delivery must be impeccable.

STUDIU DE CAZ .pdf

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.