Case Study: Integration of a 1 MWh Storage System into a 400 kW Photovoltaic Park

The photovoltaic park, with an installed capacity of 400 kW and equipped with SMA Sunny invertersoperates in full grid-injection mode. To optimize economic performance and reduce losses caused by grid limitations and tariff fluctuations, an electrical energy storage system has been installed , a 1 MWh variant..

Main objectives of integrating the storage system:

  • Peak shaving of photovoltaic injection;
  • Storing energy during low-price (off-peak) periods;
  • Selling stored energy during high-price (peak / day-ahead) periods;
  • Stabilizing grid injection and maximizing revenue.

Technical Configuration

Photovoltaic Component:

  • Installed power: 400 kW
  • Inverters: SMA Sunny Tripower
  • Operating mode: Injecție totală în rețea

Storage system:

  • Total capacity: , a 1 MWh variant.
  • Bidirectional inverter power: 500 kW
  • Tehnologie baterii: Li-Fe-PO₄
  • Fully integrated with: EMS, BMS, STS, HVAC, fire suppression system, lighting, protections

Operating Strategy

The system is controlled by Energy Management System (EMS)which correlates in real-time the estimated production, market energy prices, battery status, and injection thresholds. The charge/discharge cycles are automatically controlled to optimize costs and ensure efficient use of stored energy.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.